JIPM TPM MANUAL PDF

Class TPM award from the JIPM. . The Pillars of JIPM-TPM Are: . inspection items select general inspection items. Manuals. Manuals. Manual No JISHU HOZEN IMPLEMENTATION. The TPM .. Audit to be in line with JIPM methodology, for covering each machine of plant, specifically by. Total Productive Maintenance, shortly termed as TPM, is the concept originated and developed by Japan Institute of Plant Maintenance (JIPM) Tokyo, since late.

Author: Vusar Dugul
Country: Barbados
Language: English (Spanish)
Genre: History
Published (Last): 25 November 2004
Pages: 401
PDF File Size: 20.85 Mb
ePub File Size: 12.5 Mb
ISBN: 171-6-18550-682-7
Downloads: 21806
Price: Free* [*Free Regsitration Required]
Uploader: Zolonos

OEE – Overall equipment effectiveness or Overall equipment efficiency?

Examples of One-Point Lessons. Philosophy of One-Point Lesson. Improving this equipment will be well-supported by operators. What is One-Point Lesson?

Significantly reduces instances of unplanned stop time. Since beginning our program in AprilI have had great difficulty finding information about TPM that not only complemented various skill levels but also various learning styles. Create a simple Autonomous Maintenance checklist for all inspection, set point, lubrication, and other operator-controlled maintenance tasks creating Standardized Work for nanual Autonomous Maintenance process.

Step 3 – Draw up cleaning and lubricating standards.

TPM is a Process for Improving Equipment Effectiveness | Lean Production

By way of contrast, if an initiative is perceived as having been tried and failed, it will be much harder to successfully implement that initiative in the future. If there is an existing change control process, be sure to utilize that process when implementing fixes.

  IRYDOLOGIA W PRAKTYCE PDF

Consider externalizing lubrication points that are difficult to access or that require stopping the equipment where feasible and safe to do so.

What AM is Not.

We’ll ship you an XL unit to use free-of-charge for 90 days. Let’s make a brief summary for a better understanding of the difference between overall effectiveness and overall efficiency:.

Here is how it works:. Two key TPM concepts will be introduced:. The company a has no substantive Safety, Health, Environment program, or b the existing program would significantly benefit from being linked into existing TPM activities. This chapter also explains tagging–problem spots are tagged for immediate visibility, then the tags are systematically removed after the root cause of the problem has been eliminated.

Overall productivity means achieving maximum efficiency with minimum resources. For wear components, establish the current wear level and a baseline replacement interval in some cases replacement may be triggered early by an Autonomous Maintenance inspection as established in Step Two.

AM Supports a Culture Change. If sufficiently effective, document any changes to procedures uipm move on to the next major loss. Ensures equipment is well-cleaned and lubricated. Reduces cost by catching defects early it is expensive and unreliable to find defects through inspection. The clear presentation or the concept set this book apart from many of the others I have read.

One-Point Lessons as a Cascading Tool. TPM Total Productive Maintenance is a holistic approach to equipment maintenance that strives to achieve perfect production: Reduces number of defects. Managers Must Play an Active Role.

  ACHESON VIROLOGY PDF

Organize a structured problem solving session to: All participants will also receive the only Slovenian, working manual on the TPM approach in eight pillars. Quality is at the forefront of issues facing the company. Frees maintenance personnel for higher-level tasks. Quality Maintenance Design error detection and prevention into production processes. This section provides a step-by-step roadmap for a simple and practical TPM implementation.

OEE – Overall equipment effectiveness or Overall equipment efficiency? | PERFORMANCE STORYBOARD

More forgiving of limited TPM experience. Availability takes into account Availability Losswhich includes all events that stop planned production for an appreciable length of time typically several minutes or longer. Sort eliminate anything that is not truly needed in the work area Set in Order organize the remaining items Shine clean and inspect the work area Standardize create standards for performing the mamual three activities Sustain ensure the standards are regularly applied It should be reasonably intuitive how 5S creates a foundation for well-running equipment.

In many cases, light training will be required to bring up the skill level of operators.